Drilling and Blasting

1 million m³
bedrock on a yearly basis

Wasa Dredging is a highly specialized, market leading company in the field of drilling and blasting underwater bedrock. We are blasting up to 1 million m3 of bedrock on a yearly basis. Wasa Dredging is operating two combined dredging/drilling units: “Hector” and “Boulder”. Both of these units are capable of single-handedly executing projects involving both drilling, blasting of bedrock as well as dredging of the blasted material. In 2019 these two units will be accompanied by “Harald”, a new, third combi-unit.

Our equipment for drilling and blasting has been developed in-house and is based on our extensive experience in the field. The computerized pumping system for charging the drilled holes, advanced progress tracking system, experienced staff and in-house designed drilling towers ensure a high-quality and quantity operation. We believe our drilling and blasting operation to be the best available on the market today.

Other activities

Wasa Dredging is an international marine contractor specialising in:
  • Port and channel dredging
  • Underwater rock drilling and blasting, rock dredging
  • Environmental dredging
  • Leveling of gravel as foundation for underwater constructions
  • Land reclamation of dredge material
  • Construction of breakwaters
  • Dredging of trenches