 
 
| Model: | Wasa BHD 18000 | 
| Construction and in service: | June 2014 | 
| Length: | 47 metres | 
| Width: | 17 metres | 
| Moulded depth: | 4.0 metres | 
| Deck crane | EFFER 240 (240 tonne metre) | 
| Excavator: | Hitachi EX 3600 (360 tonne) | 
| Main engine: | 1450 kW | 
| Auxiliary engines: | 2 x 120 kW | 
| Booms: | 14, 18 metres | 
| Arms: | 7, 9 , 12 metres | 
| Buckets: | 22, 18, 14, 12 m3 | 
| Short configuration dredging depth: | 17 metres using 22-18 m3 bucket | 
| Middle configuration dredging depth: | 19 metres using 18 m3 bucket | 
| Long configuration dredging depth: | 24 m using 12 m3 bucket | 
| Max dredging depth:, special config: | 29 metres using 7 m3 bucket | 
| Spuds: | 1.6 x 1.6 x 32 metres | 
| Software: | Foreshore dredge monitoring / recording | 
| Class: | Bureau Veritas unrestricted navigation | 

| Model: | Wasa BHD 12000 / Sea bow | 
| Construction and in service: | 2010 | 
| Length: | 41 metres | 
| Width: | 15 metres | 
| Moulded depth: | 3.70 metres | 
| Excavator: | Hitachi EX 2500/6 (250 tonnes) | 
| Main engine: | 1044 kW | 
| Auxiliary engines: | 1 x 80 kW, 1 x 120 kW | 
| Booms: | 13.6, 16 metres | 
| Arms: | 7, 9, 11 metres | 
| Buckets: | 14, 12, 9, 7.5 m3 | 
| Short configuration dredging depth: | 16 metres using 12-14 m3 bucket | 
| Middle configuration dredging depth: | 18 metres using 12 m3 bucket | 
| Long configuration dredging depth: | 22 metres using 7.5 m3 bucket, 23 m special configuration | 
| Spuds: | 1.4 x 1.4 x 28 metres | 
| Optional: | Drill Tower for blasting, using Sandvik HL1560 hammer | 
| Software: | Foreshore dredge Master Backhoe monitoring / recording | 
| Class: | Bureau Veritas unrestricted navigation | 

| Model: | Wasa BHD 6000 | 
| Construction and in service: | 2010 | 
| Length: | 50.4 metres | 
| Width: | 12 metres | 
| Moulded depth: | 2.5 metres | 
| Excavator: | Hitachi EX 1200/6 (120 tonnes) | 
| Booms: | 11.5 , 13 metres | 
| Arms: | 5, 7, 9 metres | 
| Buckets: | 4, 5.5, 6.4 m3 | 
| Short configuration dredging depth: | 13.3 metres using 6.4 m3 bucket | 
| Middle configuration dredging depth: | 14.9 metres using 6.4 m3 bucket | 
| Long configuration dredging depth: | 18.5 metres using 4 m3 bucket | 
| Spuds: | 0.8 x 0.8 x 24 metres | 
| Optional: | Drill Tower for blasting, using Sandvik HL 1560 hammer | 
| Software: | Foreshore dredge Master Backhoe monitoring / recording | 

| Length: | 59 meters | 
| Width: | 14 metres | 
| Moulded depth: | 3 meters | 
| Excavator: | Hitachi EX 2500-6 (250 tonnes) | 
| Main engine: | 1044 kW | 
| Booms: | 13.6 m and 16 m | 
| Arms: | 7 m, 9 m, 11 m and 15,5 m | 
| Buckets: | 4 m³, 7,5 m³, 12 m³, 9 m³ and 14 m³ | 
| Spuds: | 1,4 x 1,4 x 34,2 m |