Fairway and Harbour of Vaasa

Dredging of fairway and harbour of Vaasa, and reclamation of land with the masses. Blasting of rock along the fairway, and removal of fairway signals plus installing a new lighthouse.
Blasting and dredging of fairway, Vitjet

Use of bubble curtains around main blasting area to reduce pressure Careful dumping of rock masses filling for future new quay areas
Blasting and dredging of fairway, Innseiling Florø

Dredging of smaller areas contaminated masses Use of bubble curtains around salmon cages to reduce pressure
Blasting and dredging of harbour basin, Port of Norvik
Blasting and dredging of fairway, Langevåg Bømlo
Blasting and dredging of harbour basin, Port of Gothenburg

Dredging of about 6700m3 of contaminated masses, was taken to W&M Recovery AS reception.
Blasting and dredging of fairway, Mortingbåen
Fairway, Trangstraumen and Gunnarbåten
Dredging of harbour basin, Klaipeda

Work carried out in a very limited area in connection with several sheet pile walls
Blasting and dredging of harbour basin, Älvsborgshamnen Gothenburg

Dredging of about 9000 m3 of contaminated masses, was taken to NOAH’s reception in Norway.