Skellefteå Harbour

Skellefteå Harbour

Dredging polluted material, the material was brought to land and unloaded onto dumpers for further treatment

Ripping and dredging hard moraine

Preparation of bottom for erosion protection

Client
PEAB
Project Scope
Project Timeline
2025
Location
Skellefteå, Sweden
Facts
Dredging Polluted Material [m3] 23 000
Dredging Soft Material [m3] 66 000
Riping and Dredging [m3] 23 500 Hard moraine
Blastning Bedrock [m3] 8 200 careful blasting of bedrock
Dredging Blasted Rock [m3] 25 000